hebetec engineering LTD
 

NEWS

 

 

Hebetec - Sliding the new Weser Bridge

Bridge weight: 4'000t

Bridge length: approx. 200m

Sliding distance: 18m

Alternative lifting system

Kran & Bühne, Edition 165, February 2020

Download

 
 

 

Meet HEBETEC at KONTEC 2019.

 

 

Visit us at the ICOND 2018 - Booth 3

Meet our Heavy lifting specialists from 6 - 8 November.

 

 

We are pleased to announce that Hebetec Engineering will be joining
Freyssinet USA at the Breakbulk Americas 2018.


We would like to invite you to visit our booth (Stand 1551)
during trade fair and meet our heavy lifting specialists.


2 - 4 October at the George R Brown Convention Center in Houston.

 

Oakland Bay Bridge – demolishing of 504’ spans

more  HTE - Jobreport

 

"HSLS" - Hebetec Synchronized Lifting System   more

 

New Office Building at Herzogenaurach, Germany

Website   HTE-Job Report

 

Roof Lifting - Stadium "Volgograd Arena", Russia

Website  HTE - Jobreport

 

Ashalim Solar Power Station, Israel

Website   HTE-Job Report

 

Forth Replacement Crossing / Queensferry Crossing Bridge

The centre tower deck has been recognised by Guinness World Records as the largest freestanding balanced cantilever in the world.

BBC News    MailOnline News   HTE - Job Report

 
 
 
 

Registration newsletter HEBETEC