hebetec engineering SA
 

NEWS

 

 

Hebetec - Sliding the new Weser Bridge

Bridge weight: 4'000t

Bridge length: approx. 200m

Sliding distance: 18m

Alternative lifting system

Kran & Bühne, Edition 165, February 2020

Download

 
 

 

Meet HEBETEC at KONTEC 2019.

 

 

Visit us at the ICOND 2018 - Booth 3

Meet our Heavy lifting specialists from 6 - 8 November.

 

 

We are pleased to announce that Hebetec Engineering will be joining
Freyssinet USA at the Breakbulk Americas 2018.


We would like to invite you to visit our booth (Stand 1551)
during trade fair and meet our heavy lifting specialists.


2 - 4 October at the George R Brown Convention Center in Houston.

 

Oakland Bay Bridge – demolishing of 504’ spans

plus  HTE - Jobreport

 

Système de levage synchronisé Hebetec "HSLS" plus

 

Nouveau siège d’entreprise à Herzogenaurach, Allemagne

Site web    HTE-Job Report

 

Levage de la toiture du stade "Volgograd Arena", Russie

Site web  HTE - Jobreport

 

Centrale solaire Ashalim, Israël

Site web    HTE-Job Report

 

​Forth Replacement Crossing / Queensferry Crossing Bridge

La travée centrale du pont Queensferry Forth Crossing a été homologuée par le Livre Guinness des Records comme la plus longue construction en encorbellement du monde.

BBC News    MailOnline News   HTE - Job Report

 
 
 
 

Registration newsletter HEBETEC
Vous recevrez la lettre d'information en anglais