Bridge at Lancy, Switzerland

Description

The lowering system for the railway bridge at Lancy (CEVA) was developed by Hebetec Engineering Ltd. and first time applied by Freyssinet.

The lowering / lifting system consisting of telescopic columns is laid out to execute the laborious piling works at ground level, which is a significant advantage for working safety.

The horizontal stability of the telescopic system is achieved by fixation to bridge pier.

Due to large lowering steps (270 – 360mm) rapid execution of lowering works can be achieved. A cylinder stroke of 400mm allows for the application of MegaSteel standard modules. Job Report

Facts

Installed lifting capacity 1'600 t
Bridge weight 800 t
Lowering distance 1.6 m
Duration 5 h

Handling equipment

 
DP-400-400 8 pcs
PA-4-16 3 pcs

 