hebetec engineering LTD
1.JPG
2.JPG
3.JPG
4.JPG
6.JPG

York Mills Bridge Toronto, Canada 

Description

The bridge bearings had to be replaced in the course of required maintenance works at York Mills Road Bridge.

Temporary MegaSteel braces built around the bridge piers took over the full bridge load, allowing to exchange the bearings under full traffic. Job Report

Daten

Maximum weight 2'000 t
Support height 2 - 8 m

Eingesetzte Geräte

MegaSteel material 77 t

 

Contact