Lifting of a roof for the stadium in Salzburg, Austria

Description

In preparation for the Euro 2008 the stadium in Salzburg had to be extended.

The whole roof of the stadium was lifted to get more space for seats.

The roof was lifted about 10.5 meters with strandjacks which were placed at the top of the temporary MegaSteel towers. Job Report

Facts

Maximum weight 2'200 t
Lifting height 10.5 m

Handling equipment

Strand jack H-40 48 pcs
Strand jack H-70 32 pcs
Total MegaSteel 500 t

 

Contact