Stadium Roof Lifting at Bilbao, Spain

Description

For the 50‘000 spectators San Mamés Stadium at Bilbao, Spain, Hebetec was assigned to lift the rope support structure for the inner roof construction.

The ground floor assembled structural rope was lifted and tensioned with strand jacks arranged at two levels.

During operations the 160 strand jacks applied for this job were monitored by a camera system. Job Report

Facts

Distance lifting and tensioning 50 m
Duration of lifting 3 we

Handling equipment

Strand jacks H-40 60 pcs
Strand jacks H-70 40 pcs
Strand jacks H-140 24 pcs

 