hebetec engineering LTD
1.jpg
2.jpg
3.jpg
4.jpg
5.jpg
6.jpg
7.jpg
8.jpg

Lifting of a boiler support grid in Wilhelmshaven, Germany

Description

Hebetec Engineering lifted the boiler support grid at the new construction of a coal fired power plant at Wilhelmshaven in Germany.

By using 16 type H-140 strand jacks the total lifting capacity of 2’240 tons was sufficient to lift the support grid in one work step into its final position at 120 m above ground. Job Report

Facts

Weight of the support grid 1'300 to
Lifting height 120 m

Handling equipment

Strand jack H-140 16 pcs

 