Modul lift Sousse, Tunisia

Description

In the middle of 2012, Hebetec was able to lift several heating surface banks (modules) in a combined gas and steam power station located near Sousse as part of works on the expansion of the Tunisian energy grid.

Hebetec used 24 type H-140 strand jacks and 6 type H-70 strand jacks. The total lifting capacity thus came to round 3’800 tons.

It took two months to pull the modules in several phases up a height of some 25 meters. Job Report

Facts

Max. lifting weight 3'000 to
Lifting height 25 m

Handling equipment

Strand jack H-70 6 pcs
Strand jack H-140 24 pcs

 