Installation of two generators and two transformers in Erbil, Iraq

Description

For the conversion of the gas power plant, which is located 20 km from Erbil, into a combined-power plant, Hebetec Engineering was commissioned to shift and lift two generators and transformers.

As a result of the expansion to the combined-power plant, the existing capacity of 1’000 megawatts could be increased by 470 megawatts, while the fuel consumption remained unchanged. Job Report

Facts

Max. lifting weight 220 t
Lifting height 17 m
Sliding distance 30 m

Handling equipment

Strand jack H-140  4 pcs
Strand jack H-40  4 pcs
Towers 25 m
Sliding beams 42 m
Total weight 200 t

 