Installation of two generators and two transformers in Erbil, Iraq
Description
For the conversion of the gas power plant, which is located 20 km from Erbil, into a combined-power plant, Hebetec Engineering was commissioned to shift and lift two generators and transformers.
As a result of the expansion to the combined-power plant, the existing capacity of 1’000 megawatts could be increased by 470 megawatts, while the fuel consumption remained unchanged. Job Report