Moving of DSO Meren (GGCP) Topside & LSF, Korea
Description
In 2014 the DSO Meren topside was moved for load out. Hebetec Engineering Ltd. provided the equipment for this load out action.
The 4 strand jacks with a total pulling capacity of 2’400t were operated by a centralized control system.
The topside has been moved onto a barge, operated by Cosco. Job Report