Moving of an oil rig in Bongkot, Thailand

Description

On July  2011 the 23‘600 ton heavy oil rig was shifed and subsequently put into operation in the Gulf of Thailand.

Hebetec Engineering LTd was fully responsible for shifting works.

The oil rig was moved with sliding shoes with teflon inlays and Strand jacks for loading. Job Report

Facts

Weight 23'600
Moving distance 90 m

Handling equipment

Litzenheber H-600 8 pcs

 