Moving Oil Rig Bergading at Ulsan, Korea
Description
On March 2017 the 24’000 ton weighing oil rig Bergading was shifted to load on bord of a barge and eventually put into operation in the Gulf of Thailand.
Hebetec Engineering Ltd was fully responsible for shifting works.
For the loading the oil rig was moved with strand jacks and sliding shoes with teflon inlays. Job Report