hebetec engineering LTD
Baronia_0.JPG
Baronia_1.JPG
Baronia_2.JPG
Baronia_3.JPG
Baronia_4.JPG
Baronia_5.JPG

Moving Oil Rig Baronia at Ulsan, Korea

Description

On May 2017 the 17’000 ton weighing oil rig was shifted to load on bord of a barge and eventually put into operation in the Gulf of Thailand.

Hebetec Engineering Ltd was fully responsible for shifting works.

For the loading the oil rig was moved with strand jacks and sliding shoes with teflon inlays. Job Report

Facts

Weight 17'000 to
Moving distance 120 m

Handling equipment

Strand jack F-1000 4 pcs
   

 

Contact