APS Bridge Sliding Rochester, UK 

Description

In Rochester, UK, a new railway underpass was built besides an existing railway crossing.

The demolishing of the existing railway line, excavation of the embankment, sliding in of the new underpass in end position and rebuilding of the tracks took place within a weekend campaign.

For the sliding in action Hebetec used the APS-System. Job Report

Daten

Bridge Weight 2'500 t
Sliding distance 40 m
Sliding Speed 50 m/h

Eingesetzte Geräte

APS-385 10 pcs
Push-Pull-Unit 32 2 pcs
Power pack 2 pcs

 