Sliding a bridge with APS in Mionnay, France
Description
In Mionnay, France, a new railway underpass was built besides an existing railway crossing.
The demolishing of the existing railway line, excavation of the embankment, sliding in of the new underpass in end position and rebuilding of the tracks took place within a weekend campaign.
For the sliding in action Hebetec used the APS-System. Job Report