Lifting of bridge segments Ulyanovsk, Russia
Description
Hebetec received the assignment to lift five bridge segments into final position for the completion of the Volga Bridge at Ulyanovsk in Russia
The segments were transported by barges to the bridge piers. In reason of the spans length being larger than the distance between the piers the lifting took place offset.
The action was followed by a displacement in axis direction and final positioning on to the permanent bearings. Job Report