Goethals Bridge, USA 

Description

Hebetec Engineering successfuly lowered the 90-year-old Goethals Bridge which connected Staten Island, NY to Elizabeth, NJ. Hebetec and Freyssinet worked closely with the contractor to successfully accomplish this mission.

Once the four lifting units were positioned on the four corners of the span to be lowered, the jacks took over 80% of the expected load and held it for more than a month.

The bridge was lowered maintaining tight tolerances in multiple directions. Lasers were mounted near the jacks and were used to continuously monitor the bridge‘s alignment.

Job Report

Facts

Bridge length 2'164 m
Bridge width 19 m
Clearance below 43 m
Longest span 205 m
Execution 2018/2019

Handling equipment

Lifting jacks H-400 4 pcs
Hydraulic pump PA-4-30 2 pcs
Distance measuring lasers 4 pcs

 